BRIDGES

Oakwood

Steel Bridge Rehabilitation

CT Department of Transportation
Design of a replacement continuous steel superstructure utilizing shallower depth hybrid steel girders and roadway profile modifications.

Fitchburg

Bridge Reconstruction Design

Fitchburg, MA
Design services for a design-build project consisting of a reconstruction of a 50-foot single span-iron truss bridge.

Framingham Maple

Stone Culvert Rehabilitation

Framingham, MA
Final designs, construction bid documents and resident engineering inspection services for the rehabilitation of an existing stone culvert.

Boston Farren

State-wide Accelerated Bridge Program

MassDOT
Engineering and technical support services to the MassDOT for various types of highway and bridge projects under the state’s Accelerated Bridge Program.

Gloucester Good Harbor

Pedestrian Bridge

Gloucester, MA
Pedestrian bridge repair at Good Harbor Beach, following hurricane season.

Peabody Howley

Bridge Replacement

Peabody, MA
Design documents for replacement of existing three-span historic structure over the North River.

Making Improvements to the MBTA Making Improvements to the MBTA
Making Improvements to the MBTA

Weston & Sampson Engineers is providing Owner’s Representative services to the Massachusetts Bay Transportation Authority (MBTA) on its Red Line/Orange Line Infrastructure Improvements Program.

...
Read More

↤ Highlights

Back to Transportation