Charlotte-Douglas International Airport (CLT) Intermodal Facility

Gas Line Relocation

Charlotte, NC
Gas line relocation design and field design analysis for the relocation of 2012’ of 12” steel and 2082’ of 16” steel high pressure main at Charlotte-Douglas International Airport (CLT) Intermodal Facility

Transmission Pipeline Haw River, Burlington, NC

Natural Gas Transmission Pipeline

Burlington, NC
Provided complete survey, design, permitting, materials procurement and construction bidding services in support of the installation of 22,000 feet of 12-inch natural gas transmission pipeline in Burlington, NC.