Reconfigured 2012 Olympic Trials Swimming Pool
Weston & Sampson worked with the owner and Myrtha Pools to reconfigure the 2012 Olympic Trials swimming pool for the Boston Sports Institute, which is a public/private partnership between the Town of Wellesley, MA and Edge Sports Group, and features the two pools, two hockey rinks, and an indoor turf field.
Our aquatic engineering division developed a plan to reconfigure the original 50-meter pool into one 10-lane, 25-yard pool and a smaller separate 3-lane warm up and teaching pool. Our pool construction division was selected to install the pools and equipment, which features regenerative media filtration, at this beautiful new facility.