As a member of the Design-Build team, assisted in preparing the preliminary design, technical presentation, construction schedule and contractors bid. After award, provided location surveys required for design and performed roadside drainage. During construction, performed on-site inspections and provided additional design to accommodate unexpected natural spring intrusion into the pavement areas.