Methuen, MA
Evaluation and implementation of energy conservation measures (ECMs) at the Bolduc Street Pumping Station.
Category Archives: Energy Audits
National Grid Project Expeditor Nantucket
Nantucket, MA
Owner’s Project Management (OPM) services to evaluate and implement four energy conservation measures (ECMs) at the Surfside Wastewater Treatment Facility.
National Grid Project Expeditor Rockport
Rockport, MA
Upgrades designed to conserve energy while also providing benefits in lighting quality and quantity resulting in utility cost savings.
Water Plant Energy Conservation
Essex, MA
Energy conservation at the Essex Water Treatment Plant.
Energy Saving Wastewater Pumps
Tyngsborough, MA
Wastewater pumps designed to conserve energy and reduce operating costs at the Mascuppic Trail Wastewater Pump Station.
Pump Station Energy Management
Lincoln, RI
Energy management project at the Providence Connection Pump Station.
Energy Efficiency and Geothermal System Design
Boston, MA
Energy efficiency and geothermal system design for Roxbury Community College.
ASHRAE Level II Energy Audit
Pembroke, MA
ASHRAE Level II energy audit for the Great Sandy Bottom Pond Water Treatment Plant.
Energy Efficient Lighting Upgrades
Lincoln, NH
Energy efficient lighting upgrades at the Lincoln, NH WTP and DPW.