Weston & Sampson installed a gas distribution main extension to feed a new industrial facility in Columbia, South Carolina. The extension consisted of 10,000 LF of 10-inch high pressure steel pipeline. Our firm delineated all wetlands onsite, plus performed a route survey used to develop construction plans (including plan and profile). Permits were acquired from SCDOT, Richland County Zoning and Planning and MS4 Stormwater, and the Army COE.
Gas Distribution Main Extension
Posted in Natural Gas, natural gas pipeline distribution and tagged Columbia SC, distribution pipeline.