Installation of Gas Distribution Main Pipeline

Gas Distribution Main Pipeline

Weston & Sampson was selected for development of a gas distribution main installation to feed the new Pet Foods facility in Columbia, South Carolina. The project consisted of 5 miles of 4-inch steel gas pipeline. Our firm performed a route survey used to develop construction plans, including plan and profile. Permits were acquired from SCDOT, DHEC Stormwater, Saluda County MS4 Stormwater, and the Army COE.

BACK

Looking for assistance with your project?

Posted in Natural Gas, natural gas pipeline distribution and tagged , , .