2012-2013 Piedmont Natural Gas Master Services Agreement, Charlotte-Douglas International Airport (CLT) Intermodal Facility
Our firm provided gas line relocation design and field design analysis for the relocation of 2012 feet of 12-inch steel and 2082 feet of 16-inch steel high pressure main lines. The project included tie-ins, pipeline routing, pipeline location, and viable construction practices. Existing pipelines were relocated to a new easement to eliminate bends and vertical deflections under the proposed rail yard. These existing pipelines were positioned to obtain the required 10-foot minimum clearance under the tracks and avoid conflicts with proposed drainage piping.