Planning, Easement Acquisitions, and Plans and Permitting East Edisto Gas Main Extension
Weston & Sampson was selected to provide assistance to SCE&G associated with planning infrastructure improvements to relocate gas main facilities as a part of a transportation corridor improvement project for Dorchester County and the SCDOT. The project included the installation of new gas mains and relocating several connections to existing mains along SC Highway 165. This was a part of the widening of Bacons Bridge Road (SC 165) in Dorchester County, SC. The project included approximately 2,170 linear feet of gas line. Weston & Sampson performed surveying, plans, permitting and the design of a horizontal directional drill under Sawmill Branch which was also adjacent to wetland areas. Permitting efforts included SCDOT, city and county along with State DHEC and the US Army Corps of Engineers.