Indoor Athletic Pool Facility

Phillips Exeter Academy

Weston & Sampson provided design and construction management services as a subconsultant to Architectural Resources Cambridge (ARC) for the renovation of Phillips Exeter Academy’s indoor pool facility. This project included the deepening of an eight-lane, 25-yard indoor pool to a seven-foot depth to accommodate water polo and diving. The pool was deepened by nearly three feet in all areas. This pool is the first Myrtha® pool (a stainless steel wall system with a PVC liner) in the Northeast. Weston & Sampson has provided maintenance, daily operations, and repair services for this facility since 2013.

BACK

Looking for assistance with your project?

Posted in Aquatics, Industry-Education, Institutional and tagged , .