Our firm was selected for an interconnect station design and construction project at the Pembroke (NC) compressor site, located between line 175 and line 5.
The design included a preliminary schematic of the station layout for a future tie-in to the Atlantic Coast Pipeline (ACP). The preliminary schematic included the best location for the ACP equipment in the layout and location.