Albany County, NY
Weston & Sampson was retained to analyze and provide data for the feasibility of establishing a stormwater enterprise fund throughout the county.
Category Archives: Stormwater
Stormwater Management Master Plan
Chelmsford, MA
A capital improvement plan that leverages stormwater enterprise funds to address maintenance and capital improvements backlog.
Stormwater Enterprise Development
Tewksbury, MA
Weston & Sampson was retained by the Town of Tewksbury to evaluate its stormwater needs and assist in developing a dedicated stormwater funding mechanism.
Stormwater Utility Development
Chelmsford, MA
Weston & Sampson assisted with the development of a stormwater utility to fund town-wide stormwater management needs.
Stormwater Engineering Services
Framingham, MA
A feasibility study for the implementation of a stormwater enterprise fund to finance stormwater costs.
Urban Green Infrastructure Pilot Projects
Lynn, MA
Green infrastructure pilot projects were implemented to reduce flood risk and provide climate resilient adaptations.
Claypit Brook Climate Resilience Stormwater Management Capital Improvement Plan
Lowell, MA
A plan to improve resilience to flooding and extreme precipitation in the community surrounding Claypit Brook.
Waltham Resilient Stormwater Action and Implementation Plan
A plan to reduce the impacts of climate change to Waltham’s buildings and infrastructure, environment, and vulnerable populations.
Nature-Based Solutions at Horn Pond
Design and construct nature-based improvements to the Horn Pond Brook watershed to reducing flooding, improve water quality, and more.
John Fitch Highway – Climate Resilient Improvements
A plan to remake John Fitch Highway into a resilient urban corridor in Fitchburg, Massachusetts.