Peabody and Salem, MA
A Riverwalk Visioning Study and a Riverwalk Conceptual Master Plan developed through a U.S. EPA Brownfields grant
Tag Archives: peabody
Winona Water Treatment Plant Upgrades
ACEC Massachusetts 2023 Engineering Excellence Gold Award The City of Peabody selected Weston & Sampson to design, assist with bidding, provide SRF loan application assistance and perform on-site resident & office oversight during construction of upgrades to the Winona Water Treatment Plant (WTP). The WTP, a 50-year old conventional 3 MGD surface water treatment plant, […]
Bridge Replacement
Peabody, MA
Design documents for replacement of existing three-span historic structure over the North River.
Brownfields Assessment Coalition Grant
Peabody and Salem, MA
Management and administration of EPA Coalition Brownfields Grant with the cities of Peabody and Salem.
Immediate Response Actions After Transformer Release
Peabody, MA
Incident response following a transformer release at a residential apartment complex.
Chloramines Upgrades
Peabody, MA
Chloramine improvements to Peabody’s water treatment plants.
Water and Wastewater SCADA Improvements
Peabody, MA
Engineering design and construction oversight for water system SCADA projects and SCADA upgrades for Peabody’s treatment facilities.
Pump Station Contract Operations
Peabody, MA
Daily O&M for the Russell Street pump station.