Topographic and Planimetric Surveys – RDU

Service Road at Taxiway South of Terminal A and Runway 5R

Raleigh-Durham International Airport topographic and planimetric surveys

Service Road at Taxiway South of Terminal “A”
We performed topographic and planimetric surveys at Raleigh-Durham International (RDU) on a three-acre site. The site incorporated an existing service road connecting to a former taxiway. The topographic and planimetric surveys included pavement edges on taxiways and roadways, gravity utilities, above-ground utility appurtenances, and directional lighting.

Runway 5R
We performed topographic and planimetric surveys at Raleigh-Durham International (RDU) on a three-acre site on the south end of Runway 5R. Surveys included pavement edges on taxiways, runways, and service roads; gravity utilities; above-ground utility appurtenances; and directional lighting.

New General Aviation Building -Performed supplemental planimetric surveys and supplemental spot elevations of the existing ground surface on an 85 acre project site for the new general aviation redevelopment area. Supplemental services included establishment of photo panels, control network, roadway and runway pavement edge elevations, gravity utility surveys, and map classifications.

Runway 5R-23L Touchdown Lights - Performed location surveys for 63 transformer locations and 60 proposed lot pods.

BACK

Service Road at Taxiway South of Terminal A and Runway 5R

Raleigh-Durham International Airport topographic and planimetric surveys

 

We performed various topographic and planimetric surveys for four different projects at Raleigh-Durham International (RDU) Airport in North Carolina.

  • Service Road at Taxiway South of Terminal “A”
    We performed topographic and planimetric surveys at on a three-acre site. The site consisted of an existing service road connecting to a former taxiway. The surveys included pavement edges on taxiways and roadways, gravity utilities, above-ground utility appurtenances, and directional lighting.
  • Runway 5R
    We performed topographic and planimetric surveys on a three-acre site on the south end of Runway 5R. The surveys included pavement edges on taxiways, runways, and service roads; gravity utilities; above-ground utility appurtenances; and directional lighting.
  • New General Aviation Building
    We performed supplemental planimetric surveys and supplemental spot elevations of the existing ground surface on an 85 acre project site. The project site was to be used for the new general aviation redevelopment area. We provided supplemental services that included establishment of photo panels, control network, roadway and runway pavement edge elevations, gravity utility surveys, and map classifications.
  • Runway 5R-23L Touchdown Lights
    We performed location surveys for 63 transformer locations and 60 proposed lot pods.

BACK

Looking for assistance with your project?
Posted in Aviation, Construction, Survey and tagged , , , , .