Weston & Sampson is providing complete MEP/FP and aquatics design services for this brand new 68,000-square-foot YMCA in Lynn, which will have an 8,700-square-foot, two-story natatorium with lap and teaching pools and a splash pad. The building is the first of a modernization program by the MetroNorth YMCA. The project includes an elevated track, a gymnasium, several exercise studios, weight and cardio equipment spaces, sauna and steam rooms, a preschool area, café, teaching kitchen, and office, locker, toilet, and conference rooms.
As a subconsultant to Maugel Architects, Weston & Sampson is seamlessly integrating the MEP/FP systems into the building’s unique architecture. The high-efficiency, gas-fired, condensing boiler plant provides heat to the building as well as being integrated into the pool’s water heating system. Tel-data has been provided throughout the building with individual ethernet connections to each piece of cardio equipment.