Weston & Sampson was involved in a distribution and transmission gas expansion project for eastern North Carolina.
Our team designed and developed natural gas pipelines and facilities to serve 13 counties. Engineering and construction management responsibilities for the distribution and transmission gas expansion project included design oversight of distribution pipeline facilities, transmission pipelines, pressure regulating stations, customer metering stations, and custody transfer stations; preparation of NCDOT encroachment permits for gas distribution and transmission facilities; development of hydrostatic testing and pipeline purging procedures; development of odorization measures and procedures to maintain acceptable odorant levels in new transmission pipeline and polyethylene plastic pipe distribution systems subject to low flow conditions; engineering review of horizontal direction drilling (HDD) layout plans for numerous stream and river crossings, as well as the 16,000 LF crossing of the Currituck Sound at the Outer Banks. We also provided regular attendance at construction progress meetings with pipeline contractor personnel.
Project Highlights
- Distribution Pipeline Facilities, Transmission Pipelines, Pressure Regulating Stations, Customer Metering Stations, & Custody Transfer Stations
- NCDOT Encroachment Permits
- Hydrostatic Testing & Pipeline Purging
- Odorization Measures & Procedures
- Horizontal Direction Drilling (HDD) Layout Plans
- Stream & River Crossings
- Meeting Attendance