Gas Distribution Main Extension
New Distribution Main Installation with Route Survey & Design
Weston & Sampson installed a gas distribution main extension to feed a new industrial facility in Columbia, South Carolina.
The extension consisted of 10,000 LF of 10-inch high pressure steel pipeline. Our team delineated all wetlands onsite, plus performed a route survey used to develop construction plans (including plan and profile). Permits were acquired from SCDOT, Richland County Planning & Zoning/MS4 Stormwater, and the Army COE.