Gas Line Relocation

Gas Line Redesign for Roadway & Utility Conflict Resolution

Weston & Sampson provided gas line relocation design and field design analysis for the relocation of 2012 feet of 12-inch steel and 2082 feet of 16-inch steel high pressure main lines.

This project was completed at Charlotte-Douglas International Airport (CLT) Intermodal Facility as part of the Piedmont Natural Gas Master Services Agreement. The project included tie-ins, pipeline routing, pipeline location, and viable construction practices. Existing pipelines were relocated to a new easement to eliminate bends and vertical deflections under the proposed rail yard. These existing pipelines were positioned to obtain the required 10-foot minimum clearance under the tracks and avoid conflicts with proposed drainage piping.

Location
Charlotte, NC
Categories
Transmission
Project Team
Chip Hutchens

Chip Hutchens

Regional Manager, North Carolina, Raleigh

Project Highlights

  • Gas Line Relocation Design
  • Field Design Analysis
  • Tie-Ins, Pipeline Routing, Pipeline Location, & Construction Practices