Third-Party Gas System Review
Independent Review with Capacity Modeling & Flow Evaluation
Weston & Sampson firm provided utility conflict identification and relocation plans, as well as transmission and distribution pipeline installation, for NCDOT projects R-2507A/R-2583.
Services were in support of NCDOT Roadway Improvement Project US 13/US 158 between Winton, North Carolina and Tarheel, North Carolina. Our team developed a set of preliminary plans for the relocation of approximately four miles of 12-inch transmission pressure steel pipeline (R-2507A) and 1 mile of 6-inch distribution pipeline (R-2583). The pipelines were in conflict with proposed grading, drainage, and new pavement along the project corridor, as the existing highway was widened from two lanes to four. Re-location of the gas line consisted of a combination of open trench and horizontal directional drilling (HDD) methods to avoid wetland areas, lowland areas, and the interchange of US-13 and US-158. Work was performed on an accelerated schedule to comply with the Design Build Construction schedule.
Project Highlights
- Utility Conflict Identification & Relocation Plans
- Transmission & Distribution Pipeline Installation
- Open Trench & Horizontal Directional Drilling
- Accelerated Schedule
- Design Build Construction