Weston & Sampson firm provided utility conflict identification and relocation plans, as well as transmission and distribution pipeline installation, for NCDOT projects R-2507A/R-2583.

Services were in support of NCDOT Roadway Improvement Project US 13/US 158 between Winton, North Carolina and Tarheel, North Carolina. Our team developed a set of preliminary plans for the relocation of approximately four miles of 12-inch transmission pressure steel pipeline (R-2507A) and 1 mile of 6-inch distribution pipeline (R-2583). The pipelines were in conflict with proposed grading, drainage, and new pavement along the project corridor, as the existing highway was widened from two lanes to four. Re-location of the gas line consisted of a combination of open trench and horizontal directional drilling (HDD) methods to avoid wetland areas, lowland areas, and the interchange of US-13 and US-158. Work was performed on an accelerated schedule to comply with the Design Build Construction schedule.

Location
Tarheel, NC
Categories
Station Design
Project Team
Chip Hutchens

Chip Hutchens

Regional Manager, North Carolina, Raleigh

Project Highlights

  • Utility Conflict Identification & Relocation Plans
  • Transmission & Distribution Pipeline Installation
  • Open Trench & Horizontal Directional Drilling
  • Accelerated Schedule
  • Design Build Construction