Natural Gas Main Replacement
Eversource Energy
Construction plan and installation tie-in and abandonment procedures to support GMRI.

Natural Gas System Enhancement Program
Liberty Utilities
Construction plan and installation tie-in and abandonment procedures to support GSEP.

Gas Main Replacement
Botetourt County, Virginia
The Roanoke Gas Company selected Weston & Sampson to design and permit the replacement of about two miles of existing gas main.

National Grid-Approved Energy Project Expediter (PEX)
Weston & Sampson is approved by National Grid as an associate energy Project Expediter (PEX). Through this relationship, we offer our suite of energy conservation services to public and private clients located in any of the National Grid-owned electric or gas utility service territories in Massachusetts, Rhode Island, and New York.

Gas and Electric Line Permitting
Various South Carolina Clients
Design and permitting for a number of extensions, replacements and conversions to gas and electric lines.

LSP Services for Residential Oil Spill
North Reading, MA
Emergency response and LSP activities related to the release of more than 200 gallons of fuel oil in a private residence.

Pump Station Energy Management
Lincoln, RI
Energy management project at the Providence Connection Pump Station.

ASHRAE Level II Energy Audit
Pembroke, MA
ASHRAE Level II energy audit for the Great Sandy Bottom Pond Water Treatment Plant.
↤ Highlights
Weston & Sampson was contracted to provide turnkey design and construction of a solar water heating system at Massachusetts Maritime Academy (MMA). The solar thermal system is designed to provide primary heating for heat domestic hot water, with auxiliary heating for the indoor swimming pool in the Alumni Gym Building.