Crescent Lake Area Roadway & Drainage Improvements
Neighborhood Road Reconstruction with Stormwater Upgrades
Under an on-call transportation contract, Weston & Sampson was selected to provide the Town of Enfield with consulting engineering services for full-depth roadway reconstruction to numerous roads within the Crescent Lake Area.
Upgrades to the two miles of roadway included full-depth roadway reconstruction, drainage and intersection improvements, and ADA upgrades at pedestrian crossings. We also conducted an in-depth evaluation of approximately 8,000 LF of existing storm drainage pipes in ten different storm drainage pipe networks using hydraulic modeling software. As the area experiences frequent flooding, the design included upgrading the existing stormwater systems and adding several new systems consisting of approximately 5,500 LF of piping, stormwater management with Low Impact Development (LID), and stormwater quality measures.
Project Highlights
- Roadway Reconstruction
- Stormwater Management
- Drainage Design
- Intersection Improvements
- Permitting
- ADA Upgrades