New Public Works Facility

DPW Programming with Full Site Assessment & Facility Planning

The Town of Marshfield, Massachusetts, engaged Weston & Sampson to prepare a programming study and initial design for a new Public Works facility.

Once the town decided to construct a reduced building at a new site rather than the existing site, we prepared a design that would meet the operational needs of the DPW and the town’s budget. The design included large vehicle maintenance bays, a large vehicle garage, and staff support spaces, including a muster/training room, lockers and showers, and offices. We supported the town in the self-performance of some of the initial sitework, including replacement of geotechnically deficient soils and stormwater drainage and infiltration structures. Our team also helped design and oversee construction of a wetland replication project at the existing DPW site, including initial evaluation of a previously filled wetlands area, design of the restored wetland, and continued inspection of the new wetlands plantings.

Location
Marshfield, MA
Industry
Municipal
Services
Categories
Construction Phase, Infrastructure Design, Planning and Permitting, Site Design and Engineering

Project Highlights

  • Programming
  • Existing Conditions Assessment
  • Geotechnical, Environmental, & Wetlands Site Analysis
  • Wetlands Replication
  • Site & Building Design on Constrained Site
  • Cost Estimating
  • Conservation & Planning Permitting