Rockport Public Works Facility

DPW Facility Programming with Energy Efficiency & MEP Coordination

Weston & Sampson was selected to provide comprehensive planning and design services for a new DPW facility for the Town of Rockport, Massachusetts.

Our team worked closely with the DPW and the Building Committee to control costs and evaluate and implement a host of sustainability measures to provide long-term benefits. The new facility features highly efficient, hybrid electric and gas MEP systems. The administration wing is heated and cooled by a high-efficiency VRF system with winter heating efficiencies approaching 300-400%, while the industrial side of the DPW is heated by a high-efficiency, gas-fired, condensing boiler plant that is approximately 95% efficient. Ventilation is provided by a DOAS with integrated heat recovery and pretreated by a high-efficiency heat pump.

Location
Rockport, MA
Industry
Municipal
Categories
Architecture, Construction Admin, Construction Observation, Electrical, Environmental Services, Facilities, Geotechnical, Landscape Architecture, Mechanical, Plumbing, Site Civil, Stormwater, Structural, Transportation, Utilities

Project Highlights

  • HVAC
  • MEP
  • Programming
  • Energy Efficiency
  • Existing Conditions Assessment
  • Building and Site Alternatives Development
  • Cost Estimating
  • Public Engagement